DRAFT FOR REVIEW · OCTOBER 4, 2026 · GEO.TECHWARESUITE.COM · NOT PUBLISHED
Geotechnical software · Pilots open

From the first boring to the final pile capacity.

The tech in geotechnical.

Log the ground once. Run compression, tension, lateral and bi-directional load tests live, design foundations from what the test measured, and run the environmental work on the same borings.

4ASTM load tests
5Module groups
US + SIUnits from day one
SMCLROCK GWT 12 FT LOAD0 k SETTLE0.000" LOAD (KIPS) 04008001200 0.25.50.751.0 SETTLEMENT (IN) DAVISSON 1,144 KIPS
Compression test · live
Modules

What Geotechware covers.

Buy the modules you need. Each one reads the same soil profile and writes the same report format as the rest of Techware Suite.

Characterize

Boring logs + lab data

One soil profile per boring, shared by every module and every suite. Lab results attach to the layer they came from.

CPT

Cone soundings beside the boring, with soil behavior type and correlated strength.

Later

Seismic site class + liquefaction

Site class from the profile, and liquefaction triggering layer by layer.

IBCASCE 7

Test

Compression

Live load-settlement curve with Davisson and creep interpretation as the test runs.

ASTM D1143Pilot

Tension

Uplift tests with the same live curve, holds and report layout.

ASTM D3689Pilot

Lateral

Head deflection and rotation, with measured p-y curves back-calculated from the strain gauges.

ASTM D3966Pilot

Bi-directional

Upward and downward movement from an embedded jack, converted to an equivalent top-load curve.

ASTM D8169Pilot

Design

Axial + lateral piles

Drilled shafts, driven piles, ACIP/CFA and micropiles from published methods, tied to your test results.

AASHTO LRFDFHWA GEC

Shallow foundations

Bearing and sliding for spread and strip footings on the same profile.

IBC

Settlement

Immediate and consolidation settlement with time rate.

Slope stability

Circular and block failure surfaces with groundwater from the boring.

Ground improvement

Aggregate piers and rigid inclusions sized to a settlement target.

Pavements + subgrade

Subgrade support and pavement sections from the lab results.

AASHTO

Groundwater

Dewatering

Well and sump layouts with drawdown at the excavation.

Seepage

Flow under walls and through embankments, with uplift and exit gradient.

geotechware enviroModule

Phase I ESA

Records review, site reconnaissance and interviews in one checklist, with recognized environmental conditions carried into the report.

ASTM E1527

Phase II sampling + lab data

Plan soil, groundwater and soil gas samples on the site map and load lab results straight from the lab file.

ASTM E1903

Screening level comparison

Every result compared to the screening levels you pick, with exceedances flagged on the table and the map.

EPA RSLState levels

Groundwater quality + plume maps

Well-by-well trends and concentration contours, with flow direction from the Landtechware Hydro module.

Vapor intrusion screening

Screen buildings over impacted soil or groundwater with the tiered approach.

ASTM E2600

Soil + waste disposal tracking

Loads, manifests and disposal facility tied to the excavation area they came from.

Remediation progress

Concentrations over time against cleanup goals, area by area.

How it works

Four steps, one record.

1

Log the boring

Enter the profile by hand or import it. Groundwater, layers and lab data live in one place.

2

Set up the test

Pick the element, instruments and load schedule. The plan prints for the field crew.

3

Run it live

Manual readings, CSV import or live loggers. The curve draws while the jack is still on.

4

Seal the report

The calc package lands as PDF and Word the hour the test ends, ready for a PE to seal.

Test to design

Your load test calibrates your design.

Most firms run the test, file the report and design the next job with the same textbook curves. Geotechware feeds the measured response straight back into design.

  • Back-calculated p-y and t-z curves from strain gauge data
  • A spring multiplier you can see, check and carry to the next site
  • Design curves before and after the test, on one plot in the report
0408012000.511.52HEAD DEFLECTION (IN)LATERAL LOAD (KIPS)SPRING MULTIPLIER 1.38
Design before testMeasuredCalibrated design
Outputs

Reports a PE can seal.

Every module ends in a calc package laid out the way a reviewing engineer reads it, as PDF and editable Word.

ASTM D1143ASTM D3689ASTM D3966ASTM D8169AASHTO LRFDFHWA GECIBCASCE 7ACI 318
Load test reportPDF + Word
Load-settlement curvesDavisson, creep
Equivalent top-load curveBi-directional
Axial + lateral calc packagePE-sealable
Soil profile exportCSV
Pricing

Pay for what you use.

Sold on its own by the project or by the year, or bundled with the other suites. Prices are quoted during early access.

Per test

One load test program on one project. Pilot firms get the first test free.

  • Credits toward a seat if you upgrade

Quoted per test

Test Suite

All four load test modules for your team, unlimited projects.

  • Compression, tension, lateral, bi-directional

Annual, per seat

Founding firm

A limited number of early firms lock in launch pricing.

  • Three-year price lock
  • 30% off the first year
  • First right to new modules

Limited seats

Questions

Common questions.

Can I use my own data loggers?

Yes. Readings come in by hand, by CSV, or live from supported loggers. The pilot is a good time to tell us which ones your crews use.

What do you call an embedded-jack test?

A bi-directional test, per ASTM D8169. Geotechware converts the upward and downward curves to an equivalent top-load curve.

Who checks the analyses?

Every method is built from published references and checked against real field data, and each suite gets an outside PE review before release.

Does it work in SI units?

Yes. Every input and report runs in US or SI units, and you can switch per project.

Is the environmental work a separate product?

No. The Enviro module lives inside Geotechware, so Phase I and II work, lab results and plume maps sit on the same borings and wells as the geotechnical data.

Where does my data go?

Your projects stay in your firm's account, and everything exports to CSV, PDF and Word.

Contact

Join the Geotechware pilot

Pilots are open now for firms running static or bi-directional load tests in the next six months.

JT

Joe Troescher, PE
Founder. Licensed professional engineer in North Carolina. Every analysis is built from published methods and checked against field data.

hello@techwaresuite.com

Join the Geotechware pilot

This draft form is not connected yet, so nothing is sent.